919.778.4525   178 NC Hwy 111 South Goldsboro, NC 27534
ECSU Dixon Hall Facade Improvement
Bids are due on February 13, 2025 at 2 PM Eastern

Improvements to be made on the Dixon Hall Facade at Elizabeth City State University. No interior or roof work required. Work includes but is not limited to:

  • Installation of a new 4-inch brick veneer with 2-inch rigid insulation and a bituminous dampproofing system.
  • Painting of existing pre-cast concrete panels and doors/frames to remain.
  • Removal and replacement of concrete sections, tying new sections into existing footings.
  • Modifications and relocation of mechanical elements such as louvers, ducts, and conduits to accommodate the new façade.
  • Addition of new light fixtures and electrical adjustments to fit the updated exterior.
  • Incorporation of a new metal coping system and adjustments to the drainage system with new steel pipe downspouts tied into the existing underground drain lines.
  • Extension of existing footings and application of new materials for weatherproofing, insulation, and structural support.
Downloadable Files

Download All

Download All

Do you have any questions?

Contact Us To Discuss Your Next Project