ECSU Dixon Hall Facade Improvement

Bids are due on February 13, 2025 at 2 PM Eastern

Improvements to be made on the Dixon Hall Facade at Elizabeth City State University. No interior or roof work required. Work includes but is not limited to:

  • Installation of a new 4-inch brick veneer with 2-inch rigid insulation and a bituminous dampproofing system.
  • Painting of existing pre-cast concrete panels and doors/frames to remain.
  • Removal and replacement of concrete sections, tying new sections into existing footings.
  • Modifications and relocation of mechanical elements such as louvers, ducts, and conduits to accommodate the new façade.
  • Addition of new light fixtures and electrical adjustments to fit the updated exterior.
  • Incorporation of a new metal coping system and adjustments to the drainage system with new steel pipe downspouts tied into the existing underground drain lines.
  • Extension of existing footings and application of new materials for weatherproofing, insulation, and structural support.

Downloadable Files

Plans

  • 2024-10-01-23-26078-01A-ECSU-DIXON-Drawings-BID-SET.pdf Download

Specifications

  • 2024-10-01-23-26078-01A-ECSU-DIXON-Project-Manual-BID-SET.pdf Download

Download All


Do you have any questions?