Replace AHU Bldgs FC365 & RR525, MCB Camp Lejeune, NC

Bids are due on May 13, 2020 at 1 PM Eastern

The work includes: Air handling units in buildings FC365 and RR525 are installed in such a way that maintenance cannot be accommodated. FC365 and RR525 both currently have split systems. The split systems will be replaced by heat pump package units along with required duct and electrical work.

Downloadable Files

Plans

Specifications

Addenda

Request for Proposal

Download All


Do you have any questions?