NCDOT Greenville DMV/SHP Office Building & Garage Building, Greenville, NC

Bids are due on April 11, 2019 at 3 PM Eastern

The work of Project is defined by Contract Documents and consist of the following:

Construction of a new 22,527 GSF, 1-story Building of Type IIB Construction.

Construction of a new 10,341 GSF, 1-story Pre-engineered Metal Building of Type IIB Construction

Consideration of Alternate Bid #1 for new chain linked fencing.

Consideration of Alternate Bid #2 for new chain linked fencing.

Downloadable Files

Plans

  • 2019-02-25-NCDOT-Greenville-DMV-SHP-Drawings-Vol-1.pdf Download
  • 2019-02-25-NCDOT-Greenville-DMV-SHP-Drawings-Vol-2.pdf Download

Specifications

  • 2019-02-25-NCDOT-Greenville-DMV-SHP-Project-Manual.pdf Download

Addenda

Download All


Do you have any questions?