NC STATE UNIVERSITY – RIGGING REPLACEMENT STEWART THEATRE TALLEY

Bids are due on December 13, 2018 at 2 PM Eastern

The project scope includes removal of the existing rigging equipment above the Stewart Theater
and installation of all new assemblies. The project will install a tension wire grid that shall provide
a serviceable walking surface for technical personnel for access to and hanging locations for
performance lighting and performance equipment. The work also includes the installation of
electrical boxes and conduit for connections for the motorized equipment associated with the
rigging; some retrofitting of the fire protection piping and valves for the sprinkler system; and
some structural modifications to exposed trusses.

Downloadable Files

Plans

  • 2018-11-09-Stewart-Theater-Bid-Drawings.pdf Download
  • Pictures-Combo.pdf Download

Specifications

  • 2018-11-09-Stewart-Theater-Bid-Specs.pdf Download

Addenda

Download All


Do you have any questions?