Nashville Fire Station NO. 2

Bids are due on June 08, 2023 at 1 PM Eastern

The building is single story and includes plumbing, mechanical, and electrical, along with related site development. Construction includes slab on grade, load and non-load bearing masonry and steel stud walls, pre-manufactured light gauge metal roof trusses, engineered framing, steel stud, and masonry interior walls with standing seam roofing systems.

Downloadable Files

Plans

  • 22027_Nashville-FD2-FINAL-BID-DRAWINGS.pdf Download

Specifications

  • 22027_Nashville-FD2-FINAL-BID-SPECIFICATIONS.pdf Download

Addenda

Download All


Do you have any questions?