Lenoir Co Admin Building Renovation

Bids are due on March 02, 2023 at 1 PM Eastern

Renovation of an approximately 18,400 SF existing building. Renovation includes selective interior demolition, new HVAC and electrical systems, sprinkler and fire alarm systems, elevator modernization, repairs to existing exterior window units, and interior finish upgrades.

Alternate No. #1: Additive cost to replace existing cold, hot, and hot water return piping and associated fittings.

Alternate No. #2: Additive cost to provide Ballistic resistant glazing.

Alternate No. #3: Additive cost to provide Ballistic resistant glazing.

 

Downloadable Files

Plans

  • Lenoir-County-Administration-Building-Renovation-Construction-Plans.pdf Download

Specifications

  • Lenoir-County-Administration-Building-Renovation-Full-Construction-Specifications.pdf Download

Addenda

  • Lenoir-County-Admin-Addendum-1_REVISED.pdf Download
  • Lenoir-County-Admin-Addendum-2.pdf Download
  • Lenoir-County-Admin-Addendum-3.pdf Download
  • Lenoir-County-Admin-Addendum-4.pdf Download
  • Lenoir-County-Admin-Addendum-5.pdf Download

Download All


Do you have any questions?