Law Enforcement Training Center, Raleigh, NC

Bids are due on April 30, 2019 at 2 PM Eastern

Project is generally described as a two story, 59,767 square foot classroom building of B use occupancy and
IIB construction in accordance with the 2012 North Carolina Building Code. The Law Enforcement
Training Center (LETC) will be located to the north of the existing Wake County training center. Associated
sitework is included to construct the building, parking lots, and improvements to the stormwater facilities
for the shared site. The building will be constructed of exterior brick on light gauge steel frame cavity walls
with a steel frame structure and steel roof joists and a low slope roof with PVC roof membrane. Exterior
walls will be insulated with spray polyurethane insulation. Windows will consist of aluminum storefront
and curtainwall with insulated glazing. The building will be served by a geothermal HVAC system with
roof top units and distributed heat pumps. The building will be fully sprinklered with an NFPA-13 sprinkler
system. The project will pursue LEED Silver certification in accordance with the LEED Green Building
Rating System.

Downloadable Files

Plans

  • 2019-02-08_571438_BID_00-Cover.pdf Download
  • 2019-02-08_571438_BID_01-General.pdf Download
  • 2019-02-08_571438_BID_02-LifeSafety.pdf Download
  • 2019-02-08_571438_BID_03-Civil.pdf Download
  • 2019-02-08_571438_BID_04-Landscape.pdf Download
  • 2019-02-08_571438_BID_06-Arch-FE-SE.pdf Download
  • 2019-02-08_571438_BID_08-Audio-Visual.pdf Download
  • 2019-02-08_571438_BID_10-Structural.pdf Download
  • 2019-02-08_571438_BID_11-Plumbing.pdf Download
  • 2019-02-08_571438_BID_12-FireProtection.pdf Download
  • 2019-02-08_571438_BID_13-Mechanical.pdf Download
  • 2019-02-08_571438_BID_14-Electrical.pdf Download

Specifications

  • 2019-02-08_571438_VOLUME-1-SPECIFICATIONS.pdf Download
  • 2019-02-08_571438_VOLUME-2-SPECIFICATIONS.pdf Download

Addenda

Request for Proposal

Download All


Do you have any questions?