ILM Terminal Improvements Contract 3, Wilmington, NC

Bids are due on August 20, 2019 at 1 PM Eastern

The project shall consist of furnishing all labor, materials and equipment and performing all
work required to satisfactorily complete the project, which consists of phased renovation
and expansion of the Concourse, Holdroom, Holdroom Restrooms and Terminal
Restrooms. Work also includes demolition of the existing Connector between the Holdroom
and the Terminal. The project is broken down into two work schedules, with Substantial
Completion of Schedule 1 to be completed prior to commencing work for Schedule 2. There
is an alternate to Schedule 2 for the renovation and expansion of the inbound baggage
handling system (BHS) and bag claim area.

Downloadable Files

Plans

Specifications

  • 01-PROJECT-MANUAL-VOLUME-1-OF-2.pdf Download
  • 02-PROJECT-MANUAL-VOLUME-2-OF-2.pdf Download

Addenda

  • ADDENDUM-1-ILM-CONTRACT-3.pdf Download
  • ADDENDUM-2-ILM-CONTRACT-3-.pdf Download
  • ADDENDUM-3-1-OF-5-8.5X11-62.pdf Download
  • ADDENDUM-3-2-OF-5-30X42-14.pdf Download
  • ADDENDUM-3-3-OF-5-24X36-1.pdf Download
  • ADDENDUM-3-4-OF-5-8.5X11-2.pdf Download
  • ADDENDUM-3-5-OF-5-30X42-103.pdf Download
  • ADDENDUM-4-ILM-CONTRACT-3.pdf Download
  • ADDENDUM-5-ILM-CONTRACT-3.pdf Download

Download All


Do you have any questions?