Greenville Town Common Bulkhead & Esplanade Project

Bids are due on March 20, 2025 at 2 PM Eastern

1. Phased partial demolition and construction at the existing bulkhead.
2. Select demolition of existing asphalt pavement, concrete promenade, and brick
retaining wall south of the existing bulkhead.
3. Installation of new steel sheet pile bulkhead with soil anchors to the north of the
existing bulkhead.
4. Installation of a new cast-in-place retaining walls and concrete promenade.
5. Construction of new timber boardwalk with timber framing.
6. Installation of a timber decked overlook platform that is supported by steel pipe piles
and steel framing along with a timber boardwalk and bridge at the west end of the park.
7. Installation of floating dock and gangway along with a debris deflector upstream of the
new floating dock.
8. Installation of an at-grade nature trail walkway at the west end of the park.