Goldsboro Central PD/FD Expansion & Fire Station No. 4, Goldsboro, NC

Bids are due on June 29, 2018 at 10 AM Eastern

The work includes a single-story expansion of approximately 8,073 gross square feet to the
existing Central Police/Fire Department. Also included is approximately 15,153 square feet of
renovations to the existing building. New construction consists of structural steel framing with
exterior brick veneer on reinforced concrete block and steel stud walls, aluminum windows,
TPO membrane roof system, and metal roofing systems. Mechanical work includes, but is not
limited to roof top units, ductwork, plumbing, and sprinkler system. Electrical work includes,
but is not limited to panelboards, lighting fixtures, fire alarm, emergency generator, power,
technology wiring infrastructure, security systems (cameras, intercoms, duress, door controls,
and touchscreens). Sitework includes, but is not limited to demolition, stormwater and sewer
systems, concrete and asphalt paving, grading, curbing, fencing, security gates and landscaping.

Downloadable Files

Plans

  • Drawings-Police-Expansion_04-30-2018.pdf Download
  • Drawings-FS4_04-30-2018.pdf Download

Specifications

  • SPECS_Goldsboro-Police-Vol-1_04-30-2018.pdf Download
  • SPECS_Goldsboro-FS4-Vol-2_04-30-2018.pdf Download

Addenda

  • 561010_Central-Police-and-Fire-Dept-Exp-Renov-and-Fire-Station-4-Add_Addendum_06-08-2018.pdf Download
  • 561010_Central-Police-and-Fire-Dept-Exp-Renov-and-Fire-Station-4-Add_Addendum-02_06-15-2018.pdf Download
  • Add-3.pdf Download
  • 561010_Central-Police-and-Fire-Dept-Exp-Renov-and-Fire-Station-4-Add_Addendum-03_06-22-2018.pdf Download
  • 561010_Central-Police-and-Fire-Dept-Exp-and-Renov-and-Fire-Station-4_Addendum-04_6-28-18.pdf Download

Download All


Do you have any questions?