Within the Base Bid, the General Contractor constructs a conventional steel frame building erected upon a shallow foundation system and concrete slab on grade of approximately 4,648 square feet. The building consists of a single story. Exterior walls are brick veneer with cold formed metal framing backup. Roofing is a low sloped, built up system. Interior work consists of typical cold formed metal framing wall partitions with gypsum wallboard and interior finishes typical of commercial building types. Plumbing distribution supports typical commercial toilet facilities. Mechanical distribution delivers conditioned air via split system heat pump equipment and is regulated by zoned thermostats. Electrical service consists of a 300 amp Main Distribution Panel with 120/280 Volt, Three Phase, 4 Wire distribution. Sitework includes drives, parking, utilities and stormwater management devices.

Warehouse
Within the Base Bid, the General Contractor constructs a pre engineered metal building system with conventional steel administrative space erected upon a shallow foundation system and concrete slab on grade of approximately 10,210 square feet. Exterior walls are a combination of brick veneer with cold formed metal framing backup, brick veneer with concrete masonry unit backup and typical metal wall panels. Roofing is a machine seamed, standing seam metal system. Interior work consists of conventional steel second floor spaces with concrete decking, cold formed metal framing wall partitions with gypsum wallboard and interior finishes typical of commercial building types. A passenger elevator provides access to the upper floors. Plumbing distribution supports typical commercial toilet facilities. Mechanical distribution delivers conditioned air via split system heat pumps for office spaces and warehouse areas. Electrical service consists of a 500 amp Main Distribution Panel with 120/208 Volt, Three Phase, 4 Wire distribution. Sitework includes drives, parking, utilities and stormwater management devices.

Downloadable Files

Plans

Specifications

  • 2102-BN-Vol-1-Proj-Man-Binder-2022.05.16.pdf Download
  • 2102-BN-Vol-2-Proj-Man-Binder-2022.05.16.pdf Download

Addenda

  • 2102-Addendum-No-1-Binder-2022.06.09.pdf Download

Download All


Do you have any questions?