Construct AMSREL Shop, FRCE, B137

Bids are due on July 27, 2021 at 11 AM Eastern

The intent of this project is to realign the existing shop area and enclose relocated and sensitive measuring equipment within the lab area. The work includes the modification of approximately 3,200 square feet within the production machine shop area in Building 137, in order to support the Advanced Measurement Services and Reverse Engineering Lab (A.M.S.R.E.L)component operations.

Downloadable Files

Plans

Specifications

Addenda

Request for Proposal

  • RFP-7058227-Const-AMSREL-B137-FRCE.pdf Download

Download All


Do you have any questions?