Brunswick Community College Allied Health Addition and Renovations, Bolivia, NC

Bids are due on December 20, 2018 at 3 PM Eastern

The project consists of site work including building demolition, new parking lots, stormwater improvements, utility connections, and landscaping. Building construction includes partial renovations to 12,549 sf building constructed in 2008 and a new addition of 15,047 sf. The new addition includes a structural steel frame, brick veneer and metal siding, single ply membrane and standing seam metal roofing, aluminum storefront, interior gypsum walls, plumbing, mechanical, and electrical systems.

Downloadable Files

Plans

  • BCC-Allied-Health-CD-Drawing-Set.pdf Download

Specifications

  • BCC-Allied-Health-CD-Specification-Book.pdf Download

Download All


Do you have any questions?